Charging site without a name
Fast charging in 85459 Berglern
Reliability
not assessable
No operational status is reported for this site. Without it there is no saying how often it was actually available.
What is known
- Operator
- EnBW mobility+ AG und Co.KG
- Address
- Wartenberger Str. 1
- State
- Bayern
- Rated power
- 150 kW
- In operation since
- June 27, 2024
- Coordinates
- 48.38750, 11.92970
Charging points
3 charging points, 0 of them with an EVSE ID.
Without an EVSE ID a charging point cannot be linked to its operational messages. It stays invisible to the assessment — even when it works perfectly. How common that is
| No. | Connector | Power | EVSE ID |
|---|---|---|---|
| 1 | CCS | 150 kW | not reported |
| 2 | CCS | 150 kW | not reported |
| 3 | Typ 2 | 22 kW | not reported |
Data from the Ladesäulenregister der Bundesnetzagentur. Datenquelle: Bundesnetzagentur, Ladesäulenregister. Lizenz: Datenlizenz Deutschland Namensnennung 2.0, https://www.govdata.de/dl-de/by-2-0. Bearbeitet: vereinheitlichte Steckertypen und Zugangsangaben, über Betreiberkennungen verknüpfte Ladepunkte, daraus abgeleitete Kennzahlen.